Hebrew
|
English
About Us
Projects
Clients
Contact
Contact us
Please fill in the required fields and our representatives will get back to you as soon as possible.
Full name
Phone
Email
Message
Security code
X
Geology Geophysics
Gas and Oil Exploration
Hydrology, Surface Water Management and Drainage
Environmental
Remediation of Contaminated Sites
Environmental Management of Solid Waste Treatment and Landfill Facilities
Risk Assessments
Cleanup of contaminated soils and environmental support
Environmental Impact Assessments and Preparation of Environmental Documents
Groundwater pollution investigations
Water Supply
Water Hammer
Pipelines
Wells
Pumping Stations
General and Detail Design
Tunneling
Reservoir Design and Civil Engineering
Regulatory and Statutory Support
Hydrogeology
Preparation of the Environmental Attachment for the National Master Plan Gas Pipeline
Client: Baran Group LTD
Main activities:
Preparation of the Environmental Attachment for the National Master Plan (NOP 37/E/2), that for the first time in Israel combines gas pipeline (24") with water pipeline (100"), along a complex infrastructure corridor of Highway 4 and surrounding environmentally sensitive areas. The preparation of the Environmental Attachment by Ecolog`s Geology Department included the preparation of some of the chapters (mainly geological and environmental guidance chapters) by Ecolog`s professionals, direction of external consultants (archeology, landscape, ecology), and support the permitting regulatory process of the NOP at the various planning committees.