ecolog engineering LTD
Hebrew|English
  • About Us
  • Projects
  • Clients
  • News
  • Careers
  • Contact
Careers
Contact us
Please fill in the required fields and our representatives will get back to you as soon as possible.
  • Geology Geophysics
  • Gas and Oil Exploration
  • Hydrology, Surface Water Management and Drainage
  • Environmental
    • Remediation of Contaminated Sites
    • Environmental Management of Solid Waste Treatment and Landfill Facilities
    • Risk Assessments
    • Cleanup of contaminated soils and environmental support
    • Environmental Impact Assessments and Preparation of Environmental Documents
    • Groundwater pollution investigations
  • Water Supply
    • Water Hammer
    • Pipelines
    • Wells
    • Pumping Stations
    • General and Detail Design
  • Tunneling
  • Reservoir Design and Civil Engineering
  • Regulatory and Statutory Support
  • Hydrogeology
loading

2D Flow Model for the Potential Failure of the Zofar Reservoir

As part of design plans of the Zofar water supply reservoir for Mekorot (National Water Company of Israel), Ecolog performed reservoir failure risk assessment.
As part of the survey, dam failure modeling was applied to define flood risk levels caused by the breach of the embankments.
The dam failure model was prepared using state of the art hydraulic software.

Ecolog Engineering Ltd.

3 Pekeris St, Tamar Park, Rehovot 7670203
Phone+972 8 9475222
Fax+972 8 9477008
Emailoffice@ecolog.co.il

Working hours:

Sun-Thu: 08:30-17:00
Ecolog Engineering Ltd.en.ecolog.co.il©All rights reserved
  Web Development   Interdeal
  InterDeal Development