Hebrew
|
English
About Us
Projects
Clients
Contact
Contact us
Please fill in the required fields and our representatives will get back to you as soon as possible.
Full name
Phone
Email
Message
Security code
X
Geology Geophysics
Gas and Oil Exploration
Hydrology, Surface Water Management and Drainage
Environmental
Remediation of Contaminated Sites
Environmental Management of Solid Waste Treatment and Landfill Facilities
Risk Assessments
Cleanup of contaminated soils and environmental support
Environmental Impact Assessments and Preparation of Environmental Documents
Groundwater pollution investigations
Water Supply
Water Hammer
Pipelines
Wells
Pumping Stations
General and Detail Design
Tunneling
Reservoir Design and Civil Engineering
Regulatory and Statutory Support
Hydrogeology
Be'er Sheva Shoket
This project includes detail design of steel pipes with a diameter of 40" and a length of 6 km, for the "Mekorot" pipeline from the Be`er Sheva North station to the Shoket 2 well (near Omer). The purpose of the pipeline is to increase the water supply on the Beer Sheva-Shoket-Arad axis.
The pipeline alignment is parallel to Road 60 and includes details of connections to wells and consumer connections, and seven horizontal drillings for road crossings.
The route of the pipeline passes through the areas of two planning committees and was coordinated with numerous authorities and infrastructure agencies.