Hebrew
|
English
About Us
Projects
Clients
Contact
Contact us
Please fill in the required fields and our representatives will get back to you as soon as possible.
Full name
Phone
Email
Message
Security code
X
Geology Geophysics
Gas and Oil Exploration
Hydrology, Surface Water Management and Drainage
Environmental
Remediation of Contaminated Sites
Environmental Management of Solid Waste Treatment and Landfill Facilities
Risk Assessments
Cleanup of contaminated soils and environmental support
Environmental Impact Assessments and Preparation of Environmental Documents
Groundwater pollution investigations
Water Supply
Water Hammer
Pipelines
Wells
Pumping Stations
General and Detail Design
Tunneling
Reservoir Design and Civil Engineering
Regulatory and Statutory Support
Hydrogeology
The Fifth Pipeline to Jerusalem
Client: Mekorot (National Water Company of Israel)
Main activities:
Ecolog in collaboration with Golder Associates (Ecolog-Golder), were engaged to perform the general design of the eastern segment of the fifth water line to Jerusalem, that includes a 13 km long tunnel below the Judean Mountains.
In addition to the geological-geotechnical and engineering characterization of the tunnel, the work included overall seismic hazards assessment to which the tunnel and some of its facilities may be exposed.