Hebrew
|
English
About Us
Projects
Clients
Contact
Contact us
Please fill in the required fields and our representatives will get back to you as soon as possible.
Full name
Phone
Email
Message
Security code
X
Geology Geophysics
Gas and Oil Exploration
Hydrology, Surface Water Management and Drainage
Environmental
Remediation of Contaminated Sites
Environmental Management of Solid Waste Treatment and Landfill Facilities
Risk Assessments
Cleanup of contaminated soils and environmental support
Environmental Impact Assessments and Preparation of Environmental Documents
Groundwater pollution investigations
Water Supply
Water Hammer
Pipelines
Wells
Pumping Stations
General and Detail Design
Tunneling
Reservoir Design and Civil Engineering
Regulatory and Statutory Support
Hydrogeology
Water Supply to the Pardes Hanna Giv'at Ada and Wadi Ara Plants
The water plants of Pardes Hanna and Giv`at Ada are old, over 80 and 50 years old, respectively.
The water supply systems in these plants must be renewed in order to adapt them to the changes that are taking place in the national water system, and to meet the projected increase in water consumption.
Ecolog performed general design for the water supply system in the Pardes Hanna-Karkur area and Giv`at Ada, including the transfer of water to the Wadi Ara and Baqa al-Gharbiyye area, and to Judea and Samaria areas.
The design is integrated with the overall approach for supplying water via the National Water Carrier northward and additional development plans in the design and adjacent areas, and re-examining the structure of the water supply system of the entire region.
The design included modeling the alternatives to the planning using Bentley`s Water CAD network solver software, where various scenarios were evaluated, including the reliability of the supply system in the event of a failure.
Based on the comparison of the alternatives, recommendations were made for the development of the water system on the basis of engineering, economic and statutory/regulatory considerations.