Hebrew
|
English
About Us
Projects
Clients
Contact
Contact us
Please fill in the required fields and our representatives will get back to you as soon as possible.
Full name
Phone
Email
Message
Security code
X
Geology Geophysics
Gas and Oil Exploration
Hydrology, Surface Water Management and Drainage
Environmental
Remediation of Contaminated Sites
Environmental Management of Solid Waste Treatment and Landfill Facilities
Risk Assessments
Cleanup of contaminated soils and environmental support
Environmental Impact Assessments and Preparation of Environmental Documents
Groundwater pollution investigations
Water Supply
Water Hammer
Pipelines
Wells
Pumping Stations
General and Detail Design
Tunneling
Reservoir Design and Civil Engineering
Regulatory and Statutory Support
Hydrogeology
Evaporation Ponds at the Solar Power Facility - Ashalim A
The plans of the Ashalim PLOT A solar power facility, included the design of three evaporation ponds performed by Ecolog. The purpose of these ponds is to collect the brine from the facility process and evaporate it. The design was carried out in accordance with the strict standards of the Ministry of Environmental Protection.